minutes.
Every time a customer asks about a part.
Every day. In every parts business in Austria.
No searching.
No calculating.
No formatting.
No remembering.
Just: this part — yes or no?
01
Vision-language models matured in 2024.
Identifying parts from a photo is now commercially viable, not a research demo.
02
B2B catalogs opened up.
TecDoc, Partslink24 and OEM finders expose APIs the engine can talk to directly.
03
WhatsApp Business + Make/n8n.
Distribution and orchestration without building heavy backend, channel infra is solved.
TYPE A
Standard inquiry (no part number).
Customer describes the part without knowing the reference number.
Without Veltora
Without Veltora
3–5 min
TYPE B
Known part number.
Customer already knows the OE or article number direct ordering flow.
Without Veltora
Without Veltora
1–2 min
TYPE C
Bulk / multi-vehicle (garage B2B).
A workshop submits requests for 3–10 vehicles simultaneously. Structured, and processed as a batch.
Without Veltora
Without Veltora
5–10 min
0.1
0.2
0.3
0.4
0.5
Figures based on 8 executions per day
Saved every month
Total monthly cost
Return on infrastructure cost.
0
Forgotten requests.
→ Fulfillment
→ Updated quote
→ 0 lost requests
€
01
Order placed
Wholesaler
Order written to ledger. Supplier triggered. Lieferschein and Rechnung queued automatically.
02
Goods received
QC & repack
Parts arrive. Veltora checks them in, flags damage, repacks where needed, all logged against the original request.
03
Documents
Lieferschein · Rechnung
Delivery note and invoice generated automatically with sequential numbering and the customer's commercial terms.
04
Handover
Delivery or pickup
Customer chooses. Either way, they get a status link — not a phone call asking if it's ready.
Generated automatically
Most platforms stop at the quote. The expensive moments live afterwards, in the silence, the second thoughts, the parts that get forgotten.
01
Today · Vienna
A request never dies. Every conversation lives in the ledger, searchable,
re-quotable, follow-uppable by a system that doesn't forget on a Friday afternoon.
6,400+
Workshops
~12 min
Lost / quote
€ 480M
Annual waste
Gewerbepark Klosterneuburg: 2-container warehouse.
Workshops
Zone 1
Zone 2
Zone 3
Klosterneuburg / Tulln
Vienna
Lower Austria
A request never dies. Every conversation lives in the ledger, searchable,
re-quotable, follow-uppable by a system that doesn't forget on a Friday afternoon.
01
Q3 2026
Vienna workshop · live
02
Q4 2026
3 pilot workshops
03
Q2 2027
Public SaaS · DACH
04
2028
Wholesaler network

Objection 01
Objection 03
Objection 03
Total runtime
End to end
Single input
PDF output
